Welcome to Advanced Polyurea & Polyaspartic Coatings
icon

Polyaspartic Water Park Elastic Varnish

Item No.: HA9506L
HA9506L is composed of polyaspartic acid ester resin, various additives, a small amount of solvent, isocyanate curing agent, etc.Mainly used for water park system waterproof coating, with good protective effect.
Description
It is composed of polyaspartic acid ester resin, various additives, a small amount of solvent, isocyanate curing agent, etc.all raw materials are produced by own. Component C is added to the anti-skid varnish according to the ratio provided.
Features and benefits
  • Good adhesion with polyurea.
  • Excellent resistance to disinfectant water
  • Simple construction and quick drying.
  • Excellent weather resistance and skid resistance.
Design purpose: Mainly used for water park system waterproof coating, with good protective effect.
Typical physical and chemical properties
Color colorless clear liquid
Weight Solid 55%-60%
Flash point 30±2℃
Viscosity 1000±200CPS(25℃,two component mixing)
Proportion 1.0±0.1g/cm3(Mixing)
Luster
Coating thickness Dry Film:60-80μm    Wet film:80-120μm
Theoretical coating rate
 
Theoretical value:8㎡/Kg/80μm
Actual value: Varies according to various factors such as surface treatment, external environment, construction method, etc.
Construction parameters
Ratio: 
Scrape + roll:B: A: thinner = 1:0.5:0.2-0.3 (no anti-slip effect)
Scrape + roll:B: A: C: thinner = 20:10:1.2 (anti-slip effect type)
Coating available time:
Temperature(℃) 5 10 20 25
Mixing(hrs) 90~110 70~90 50~60 40~50
Construction conditions:-15 ℃ ---30 ℃, humidity: ≤ 85%
Substrate temperature: must be greater than the air dew point temperature above 3 ℃.
Cleaning agent: Polyurea standard thinner
Drying time and coating interval:
Temperature (℃)     -5         5        10       20         30   
Touch dry(hrs) 4 2.5 2 1.5 1
Hard dry(hrs) 24 12 10 8 6
Coating interval (hrs) 48 24 20 16 12
The above data are for guidance only. Actual drying time / time interval before coating can be long or short, depending on film thickness, ventilation, humidity, lower paint, preloading requirements and mechanical strength.
Surface treatment
1,Rinse with salt water and other water-soluble dirt
2,Remove grease with a suitable detergent and degreaser
3,Make sure the surface is clean and dry before construction
4,Note the distance between the coating and the primer
Store
Storage time:  Paint(B): 1 year   Curing agent(A): 9 months
Storage temperature: 0 ℃ -30 ℃
Packing:
Paint: 20KG   Curing agent: 20KG