Case Studies
  • Spray Polyurea Swimming Pool Waterproofing
  • Spray Polyurea Swimming Pool Waterproofing
  • Spray Polyurea Swimming Pool Waterproofing
  • Spray Polyurea Swimming Pool Waterproofing
  • Spray Polyurea Swimming Pool Waterproofing
Spray Polyurea Swimming Pool WaterproofingSpray Polyurea Swimming Pool WaterproofingSpray Polyurea Swimming Pool WaterproofingSpray Polyurea Swimming Pool WaterproofingSpray Polyurea Swimming Pool Waterproofing

Spray Polyurea Swimming Pool Waterproofing

Project Background:

A hotel swimming pool original waterproof layer aging leakage, and the material does not meet the drinking water safety standards, the need for rapid renovation and to ensure water safety.

Solution:

Adopt GB/T5750-2006 certified spray Polyurea Coating system:

Safe and non-toxic: Passed the national drinking water health test, no harmful substances released.

Chlorine and corrosion resistant: Resistant to 500ppm chlorine water, anti-microbial, with a life span of more than 15 years.

Fast construction: direct spraying on the base surface, 4 days to finish.

Construction process:

Base surface cleaning → 2. Spray polyurea coating (2mm thick, seamless) → 3. 72-hour water closure test → 4. Water quality to meet the standard.


+86 139 2276 3266 lilylu@huisins.com +86 13922763266