lilylu@huisins.com     86-13922763266
  • Polyaspartic high solids elastic waterproof coating
Polyaspartic high solids elastic waterproof coating

Polyaspartic high solids elastic waterproof coating

Product introduction

HA8530 is a high-performance, two-component polyaspartic ester intermediate coat. It delivers critical protection and a stable base within multi-layer coating systems, specifically engineered for demanding industrial environments.

Characteristic

■ Non-solvent products; green

■ Thick film construction, more than 500μm at a time

■ Great adhesion with concrete substrate

■ Excellent elongation and Tensile strength

■ Simple construction and quick drying

Application For the waterproofing and anti-corrosion to concrete substrate(basement, bridge, roof, warehouse, water park),foam, plastic and other substrates; for waterproofing and anticorrosion of buried steel structure outer layer.

Product Specification

Color: Customized according to customers

Solid content by weight:≥98%

Flash point: Part A93Part B85

Viscosity:    6000±200CPS (25℃,A,B components combined)

Density:     1.22±0.05g/cm3

Gloss:         Bright light

Film thickness(μm): Dry:500-600   Wet:560-680

Theoretical coverage:1.23kg/mm/

Actual value:Related to surface treatment, external environment,application method and other factors.

Item

Test standard

Result

Elongation

GB/T 16777-2008

≥350%

Tensile Strength

GB/T 16777-2008

≥12MPa

Tear strength(N/mm)

GB/T 529-2008

≥30

Adhesion (concrete)

GB/T 5210-2006

≥4MPa

Abrasive resistance(1000g/500r)

GB/T 1768-2006

≤40mg

Low temperature bending-35℃

GB/T 16777-2008

No crack

Application paramether

ratio:

BA10.8(by weight, please stir well before use)

Pot life

Temperature(℃

5

10

20

30

Pot life(min)

80~90

40~60

30~40

20~30




Condition:

Environment temperature: 5℃---30℃, Environment moisture:≤75%(RH)

Substrate temperature: 3℃ higher than air dew pint

Construction method:roller (Recommend)

Thinner:Standard Polyaspartic thinner

Noted:Prior to apply by airless spary or roller, please consult our engineer.

Drying time and coating interva

Temperature(

5

10

20

30

Touch dry(hrs)

4

3

2

1.5

Hard dry(hrs)

20

15

12

10

interval(hrs)

20

15

12

10

The above data are for guidance only. Actual drying time / time interval before coating can be long or short, depending on film thickness, ventilation, humidity, lower paint, preloading requirements and mechanical strength.

Matched paint

Applicable under coat: epoxy primer, polyurea coating, or refer to our recommended matching.

Applicable top coat: polyaspartic polyurea topcoat

Surface treatment

l   Rinse with salt water and other water-soluble dirt

l   Remove grease with a suitable detergent and degreaser

l   Make sure the surface is clean and dry before construction

l   Note the distance between the coating and the primer

Storage

Shelf life: Component B:1 year  Component A:1 year

Storage temperature: 0℃-30℃

PackageComponent B:20KG  Component A:16KG

CONTACT US

Name: Lily Lu

Mobile:86-13922763266

Tel:86-20-38993165

Whatsapp:8613922763266

Email:lilylu@huisins.com

Add:Room 206,Building 21,LongTeng Xing Cheng,No.68 LongTeng South Road, DongXiao Town, XinLuo District,LongYan City,FuJian Province.China