• Polyaspartic Water Park Elastic Varnish
  • Polyaspartic Water Park Elastic Varnish
  • Polyaspartic Water Park Elastic Varnish
  • Polyaspartic Water Park Elastic Varnish
Polyaspartic Water Park Elastic Varnish Polyaspartic Water Park Elastic Varnish Polyaspartic Water Park Elastic Varnish Polyaspartic Water Park Elastic Varnish

Polyaspartic Water Park Elastic Varnish

Model HA9506L

It is composed of polyaspartic acid ester resin, various additives, a small amount of solvent, isocyanate curing agent, etc.

Description:

It is composed of polyaspartic acid ester resin, various additives, a small amount of solvent, isocyanate curing agent, etc.

All raw materials are produced by own. Component C is added to the anti-skid varnish according to the ratio provided.

Features and benefits:

● Good adhesion with polyurea.

● Excellent resistance to disinfectant water

● Simple construction and quick drying.

● Excellent weather resistance and skid resistance.

Design purpose: Mainly used for water park system waterproof coating, with good protective effect.

Typical physical and chemical properties:

Color

colorless clear liquid

Weight Solid

55%-60%

Flash point

30±2

Viscosity

1000±200CPS(25℃,two component mixing

Proportion

1.0±0.1g/cm3Mixing

Luster

Coating thickness

Dry Film60-80μm Wet film80120μm

Theoretical coating rate

Theoretical value:8/Kg/80μm

Actual value: Varies according to various factors such as surface treatment, external environment, construction method, etc.

Construction parameters:

Ratio

Scrape + roll:B: A: Thinner = 1:0.5:0.2-0.3 (no anti-slip effect)

Scrape + roll:B: A: C: Thinner = 20:10:1.2 (anti-slip effect type)

Coating available time

Temperature(℃)

5

10

20

25

Mixing(hrs)

90~110

70~90

50~60

40~50

Construction conditions:-15 ℃ ---30 ℃, humidity: ≤ 85%

Substrate temperature: must be greater than the air dew point temperature above 3 ℃.

Cleaning agent: Polyurea standard thinner

Drying time and coating interval:

Temperature ()

5

5

10

20

30

Touch dry(hrs)

4

2.5

2

1.5

1

Hard dry (hrs)

24

12

10

8

6

Coating interval (hrs)

48

24

20

16

12

The above data are for guidance only. Actual drying time / time interval before coating can be long or short, depending on film thickness, ventilation, humidity, lower paint, preloading requirements and mechanical strength.

Surface treatment:

1,Rinse with salt water and other water-soluble dirt

2,Remove grease with a suitable detergent and degreaser

3,Make sure the surface is clean and dry before construction

4,Note the distance between the coating and the Primer

Store:

Storage time:  Paint(B): 1 year   Curing agent(A): 9 months

Storage temperature: 0 ℃ -30 ℃

Packing:Paint: 20KG   Curing agent: 20KG

+86 139 2276 3266 lilylu@huisins.com +86 13922763266