lilylu@huisins.com     +86-13922763266
  • Polyaspartic Water Park Elastic Anti-slip Topcoat
  • Polyaspartic Water Park Elastic Anti-slip Topcoat
  • Polyaspartic Water Park Elastic Anti-slip Topcoat
Polyaspartic Water Park Elastic Anti-slip TopcoatPolyaspartic Water Park Elastic Anti-slip TopcoatPolyaspartic Water Park Elastic Anti-slip Topcoat

Polyaspartic Water Park Elastic Anti-slip Topcoat

Description:

It is composed of polyaspartic acid ester resin, various pigments and fillers, auxiliaries, isocyanate curing agent, etc. The main components used are aspartic acid ester resin, pigments and fillers, auxiliaries, isocyanate curing agent, etc.

Raw materials are produced by own. Component C is added to the anti-skid finish according to the ratio provided.

Features and benefits:

● Good adhesion with polyurea.

● Excellent resistance to disinfectant water

● Simple construction and quick drying.

● Excellent weather resistance and skid resistance.

Design purpose: It is mainly used for anti-skid finish of water park system with good decorative effect.

Typical physical and chemical properties:

Color

According to customers’ requirement

Weight Solid

60%-78%

Flash point:

30±2

Viscosity

1000±200CPS(25℃,Two component mixing

Proportion

1.0±0.1g/cm3mixing

Luster

Coating thickness

Dry Film100-150μm Wet film140210μm

Theoretical coating rate

Theoretical value4/Kg/150μm

Actual value: Varies according to various factors such as surface treatment, external environment, construction method, etc.

Construction parameters:

Ratio

Scrape + roll:B: A: thinner = 1:0.5:0.2-0.3 (no anti-slip effect)

Scrape + roll:B: A: C: thinner = 20:10:1.2 (anti-slip effect type)

Coating available time

Temperature(℃)

5

10

20

25

Mixing(hrs)

90~110

70~90

50~60

40~50

Construction conditions:-15 ℃ ---30 ℃, humidity: ≤ 85%

Substrate temperature: must be greater than the air dew point temperature above 3 ℃.

Cleaning agent: Polyurea standard thinner

Drying time and coating interval:

Temperature ()

5

5

10

20

30

Touch dry(hrs)

4

2.5

2

1.5

1

Hard dry (hrs)

24

12

10

8

6

Coating interval (hrs)

48

24

20

16

12

The above data are for guidance only. Actual drying time / time interval before coating can be long or short, depending on film thickness, ventilation, humidity, lower paint, preloading requirements and mechanical strength.

Coating Painting System

Application:epoxy penetrating primer, polyurea coating, or refer to our company's recommendation.

Surface treatment:

1,Rinse with salt water and other water-soluble dirt

2,Remove grease with a suitable detergent and degreaser

3,Make sure the surface is clean and dry before construction

4,Note the distance between the coating and the primer

Store:

Storage time: Paint(B): 1 year   Curing agent(A): 9 months

Storage temperature: 0 ℃ -30 ℃

Packing:Paint: 20KG   Curing agent: 20KG

CONTACT US

Name: Lily Lu

Mobile:+86-13922763266

Tel:+86-20-38993165

Whatsapp:+86 13922763266

Email:lilylu@huisins.com

Add:Room 206, Building 21, LongTeng Xing Cheng, No.68 LongTeng South Road, DongXiao Town, XinLuo District, LongYan City, FuJian Province. China