lilylu@huisins.com     86-13922763266
  • High build epoxy intermediate coating
  • High build epoxy intermediate coating
  • High build epoxy intermediate coating
High build epoxy intermediate coatingHigh build epoxy intermediate coatingHigh build epoxy intermediate coating

High build epoxy intermediate coating

  • Product Item : 725-H53-87
  • Category: Industrial Coatings
  • A two pack high build epoxy coating,Suitable for application at low temperature.
  • For protection of steel structures in wind power,offshore facilities and bridge.
  • TDS INQUIRY   EMAIL

Product Description:

- Model:725-H53-87

-A two pack high build epoxy coating.

-VOC less than 180g/L

Intended Uses:

-For protection of steel structures used in atmospheric environment.

-For protection of steel structures in wind power,offshore facilities and bridge.

Product Information:

Volume Solids:80%±2% Finish/Sheen Gloss

Film Thickness and Theoretical Coverage

Min

Typical

Max

Dryfilm Thickness(μm)

80

125

350

Wetfilm Thickness(μm)

100

156

437

Theoretical Coverage(m²/L)

10

6.4

2.3

Mix Ratio: 2:1(volume)3.4:1(mass)

Method of Application

Airless Spray

Recommended

Tip size range:0.38-0.53mm

Output pressure:17MPa

Air Spray

Tip size range:2.0-3.0mm

Output pressure:0.4MPa

Brush/Roller

For small area only

Thinner

Not recommended. Use only in exceptional circumstances (volume 5%).

Cleaner

725-HX-501

Drying Information:

-5

10

25

35

Touch Dry

6h

2h

1h

0.5h

Hard Dry

48h

24h

18h

12h

Pot Life

6h

4h

3h

2h

Overcoating Data:

-5

10

25

35

Overcoated by

Min Max

Min Max

Min Max

Min Max

725-BS43-91

48h 14d

24h 10d

18h 7d

12h 7d

725-H42-30

48h 14d

24h 10d

18h 7d

12h 7d

Storage:

Store in cool and dry conditions,Well ventilate.Keep away from hot and fire. Shelf Life: 12 months

minimum at 25,Subject to re-inspection thereafter.

Pack Size:

Part A: 22kg/13.5L in 20 L container

Part B: 6.5kg/6.5L in 9.25L container

Flash Point:

Part A: Greater than 31℃

Part B: Greater than 28

Mixed pant: Greater than 31℃

Systems and Compatibility:

Consult your Representative for the systems best suited for the surfaces to be protected.

Surface Preparation:

All surfaces to be coated should be clean, dry and free from contamination.

Newbuilding

725-H53-87 should be applied over a recommended primer coating scheme. The primer surface should be dry free from all contamination and 725-H53-87 must be applied within the  overcoating intervals specified (consult the primer data sheet).

Areas of damage should be prepared to the specified standard (e.g Sa2½ or St3 of GB/T 8923.1-2011) and patchprimed prior to the application of 725-H53-87.

Ensure zinc primers are fully cured and the surface is clean, dry and free from contamination and zincsalts before application of 725-H53-87.

Repair

725-H53-87 may be applied directly over aged 725-H53-87 following thorough fresh water washing and degreasing provided the coating to be overcoated is in an intact and tightly  adherent condition. Loose or flaking coatings should be removed back to a firm edge and an appropriate primer should be used to repair the area before application of the full coat.

CONTACT US

Name: Lily Lu

Mobile:86-13922763266

Tel:86-20-38993165

Whatsapp:86-13922763266

Email:lilylu@huisins.com

Add:Room 206, Building 21, LongTeng Xing Cheng, No.68 LongTeng South Road, DongXiao Town, XinLuo District, LongYan City, FuJian Province. China