lilylu@huisins.com     86-13922763266
  • two-component cathodic disbonding metal special polyurea primer
two-component cathodic disbonding metal special polyurea primer

two-component cathodic disbonding metal special polyurea primer

  • Product Item : DS302
  • Category: Primer & Sealant
  • DS302 Two-Component Cathodic Disbonding Polyurea Primer is a high-performance, metal-specific coating formulated with advanced polyurea-polyurethane hybrid resins. Engineered through a specialized production process, it forms an exceptionally dense and tough film. This primer offers superior adhesion to metal substrates, outstanding cathodic disbonding (CD) resistance, and excellent waterproofing and anti-corrosion properties. Its high shielding performance effectively protects assets, and it pr
  • TDS INQUIRY   EMAIL

DS302 two-component cathodic disbonding metal special polyurea primer takes polyurea polyurethane resin and polymers as main material, refined with special formulation and scientific production process. The coating film is dense, tough, with high infiltration and shielding performance, excellent cathodic disbonding performance and anti-rust, anticorrosion waterproof properties. The coating film has high adhesive strength with metal substrate and be compatible with the following coating film.

Product features and advantages

greatly increase the adhesive strength with metal substrate

excellent anticorrosion and wear resistance

excellent cathodic disbonding resistance

excellent waterproof & moisture resistance

stable resistance to temperature change

compatible with the following coating film

avoid rust and corrosion and increase the service life

high coverage rate to save cost

Application scope

Anticorrosion coating for any metal structures, stainless steel, aluminum surface. Low surface treatment with rust on metal structure.

Product information

Item

A component

B component

Appearance

light yellow liquid

color adjustable

Specific gravity

1.03

1.17

Viscosity (cps)@25℃

210

380

Solid content (%) 

65%

65%

Mix ratio (by weight) 

1

1

Surface dry time (h)

1-3h

Recoating interval (h)

Min 3 h; max 24h (20℃)

Theoretical coverage (DFT)

0.12kg/ film thickness 50μm

Typical physical properties

Item

Test standard

Results

Tensile strength (dry metal surface) Mpa

ASTM D-3359

11.5

Impact resistance (kg.cm)

GB/T 1732

60

Abrasion resistance (750g/500r) mg

GB/T 1732

11

Temperature variation resistance (-40+180℃) 24h                

GB/9278-1988

Normal

Cathodic disbonding resistance [1.5v,(65±5)℃, 48h]

HG/T 3831-2006

≤15mm

Density g/cm3

GB/T 6750-2007

1.08

Chemical resistance

Acid resistance 50%H2SO4 or 15%HCI,30d

no rust, no bubbles, no peel off

Alkali resistance 50%NaOH, 30d

no rust, no bubbles, no peel off

Salt resistance 60g/L, 30d

no rust, no bubbles, no peel off

Salt spray resistance 1000h

no rust, no bubbles, no peel off

Oil resistance, 0# diesel, crude oil, 30d

no rust, no bubbles, no peel off

(For reference: Pay attention to the influence of ventilation, splash and spillage. Independent immersion testing is recommended if requires other specific data)

Application environment

Environment temperature: -5 ~+ 35℃

Relative humidity: RH%:35-85%

Dew point: ≥3℃

Application guide

Recommend dft: 30-50μm

Recoating interval time: 3-24h

Recommended coating method: brush, roller, airless spray, air spray

Application note

The metal structure should be sand-blasted to Sa2.5 of ISO8501-1 or GB8923. If there is no grinding machine, clean up the rust, use wire wheel or sand paper to grind the surface to St2 of ISO8501-1 or GB8923 standard.

This product can be applied on the temperature under -10℃. When apply on the very low temperature, put the material drums in the air-conditioning room for more than 24h.

HUISINS recommends to agitate the coating uniformly prior to application, use up the mixed materials within 1 hour. Don’t pour the rest liquid to the original bucket.

The viscosity of product is set up in the factory, thinner shall not be random added by the applicators. Call the manufacturer for instructions to add special thinner if the viscosity changed with the application environment and humidity.

Curing time

Substrate temperature

Surface dry time

Foot traffic

Solid cure time

+10℃

3h

24h

7d

+20℃

2h

12h

7d

+30℃

1h

8h

7d

Shelf Life

storage temperature: 5℃-35℃

shelf life (from the date of production and in sealed condition):

Part A: 12 months

Part B: 12 months

store in cool and ventilated place, avoid direct sunshine, keep away from heat

package: part A: 25kg/bucket, part B:25kg/bucket

CONTACT US

Name: Lily Lu

Mobile:86-13922763266

Tel:86-20-38993165

Whatsapp:8613922763266

Email:lilylu@huisins.com

Add:Room 206,Building 21,LongTeng Xing Cheng,No.68 LongTeng South Road, DongXiao Town, XinLuo District,LongYan City,FuJian Province.China