lilylu@huisins.com     86-13922763266
  • two-component sealing penetration concrete  special polyurea primer
two-component sealing penetration concrete  special polyurea primer

two-component sealing penetration concrete special polyurea primer

  • Product Item : DS303
  • Category: Primer & Sealant
  • DS303 is a specialized, high-performance polyurea primer designed for concrete. Formulated with polyurethane resin prepolymers, it features high fluidity for deep penetration into the substrate. It effectively seals pinholes and micro-cracks, creating a stabilized surface that dramatically improves the adhesive strength of subsequent flooring or coating systems. This eco-friendly solution is the essential first step for ensuring a durable and long-lasting finish.
  • TDS INQUIRY   EMAIL

DS303 two-component sealing penetration concrete special polyurea primer takes high performance polyurethane resin pre polymer and high polymer as main film material. It has high fluidity and strong penetration into the substrate, seal the pinholes of concrete and has high adhesive strength. The coating film is eco friendly, it can greatly increase the adhesive strength when apply on concrete or other surface.

Product features and advantages

* greatly increase the adhesive strength of concrete substrate and coatings

* low viscosity, high fluidity

* excellent sealing and penetration property

* excellent anticorrosion property

* excellent waterproof moisture resistance

* stable resistance to temperature change

* compatible with the following coating film

* avoid bubbles and increase the service life

* high coverage rate to save cost

Application scope

Substrate surface anticorrosion coating for concrete, marble, ceramic tiles and wood.

Product information

Item

A component

B component

Appearance

light yellow liquid

Color adjustable

Specific gravity

1.02

1.05

Viscosity (cps)@25℃

220

260

Solid content (%) 

60%

60%

Mix ratio (by weight) 

3

2

Surface dry time (h)

1-3 h

Recoating interval (h)

Min 3 h; max 24h (20℃)

Theoretical coverage (DFT)

0.09kg/㎡ film thickness 50μm

Typical physical properties

Item

Test standard

Results

Adhesive strength (dry concrete surface) Mpa

ASTM D-3359

3.5 

Impact resistance (kg.cm)

GB/T 1732

60

Abrasion resistance (750g/500r) mg

GB/T 1732

11

Temperature variation (-40+180℃) 24h                

GB/9278-1988

Normal

Density g/cm3

GB/T 6750-2007

1.02

Chemical resistance


Acid resistance 40%H2SO4 or 10%HCI,30d

no rust, no bubbles, no peel off

Alkali resistance 50%NaOH, 30d

no rust, no bubbles, no peel off

Salt resistance 50g/L, 30d

no rust, no bubbles, no peel off

Salt spray resistance 1000h

no rust, no bubbles, no peel off

Oil resistance, 0# diesel, crude oil, 30d

no rust, no bubbles, no peel off

(For reference: Pay attention to the influence of ventilation, splash and spillage. Independent immersion testing is recommended if requires other specific data)

Application environment

Environment temperature: -5 ~+ 35℃

Relative humidity: RH%:35-85%

Dew point: ≥3℃

Application guide

Recommend dft: 20-40μm

Recoating interval time: 3-24h

Recommended coating method: brush, roller, airless spray, air spray

Application note

The concrete surface must be completely dry, clean, compact, with no grease or stains, if there has some obvious cracks and breaking area, it should be fixed in advance. Make sure to clean up the surface with air grinding or vacuum method prior to apply DS303.

This product can be applied on the temperature under -10℃. When apply on the very low temperature, put the material drums in the air-conditioning room for more than24h.

HUISINS recommends to agitate the coating uniformly prior to application, use up the mixed materials within 1 hour. Don’t pour the rest liquid to the original bucket.

The viscosity of product is set up in the factory, thinner shall not be random added by the applicators. Call the manufacturer for instructions to add special thinner if the viscosity changed with the application environment and humidity.

Curing time

Substrate temperature

Surface dry time

Foo traffic

Solid cure time

+10℃

3h

24h

7d

+20℃

2h

12h

7d

+30℃

1h

8h

7d

Shelf Life

storage temperature: 5℃-32℃

shelf life (from the date and production and in sealed condition):

Part A: 12 months

Part B: 12 months

store in cool and ventilated place, avoid direct sunshine, keep away from heat

package: part A: 25kg/bucket, part B:25kg/bucket

CONTACT US

Name: Lily Lu

Mobile:86-13922763266

Tel:86-20-38993165

Whatsapp:8613922763266

Email:lilylu@huisins.com

Add:Room 206,Building 21,LongTeng Xing Cheng,No.68 LongTeng South Road, DongXiao Town, XinLuo District,LongYan City,FuJian Province.China